    Reference: 20230188
    Release date: 14 June 2023

    Promoter – Financial Intermediary

    NOVO ENERGY PRODUCTION AB

    Location

    Description

    The project concerns the construction and operation of a production facility for advanced lithium-ion batteries for electric vehicles to be located in Gothenburg. The site will have a yearly production capacity of 35 million cells or up to 17.5 GWh of battery capacity being produced from one downstream block and associated facilities integrated into one building.

    Objectives

    The aim is to make a substantial contribution to the development of a competitive EU-based battery industry while enabling the development of the European electric vehicles (EV) industry. Additionally, the project will support the transition to e-mobility, by meeting the growing demand for EV batteries in Europe with cutting-edge battery cell.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    USD 500 million (EUR 458 million)

    Total cost (Approximate amount)

    USD 2233 million (EUR 2047 million)

    Environmental aspects

    As an integrated industrial plant, the project falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EU requiring a full EIA process. An EIA Report has been produced, presented for public consultation and the full environmental permit is expected to be issued by the Competent Authority in the Summer of 2023. During appraisal the EIB will review the EIA process and documents, as well as compliance with EU Directives for the protection of Habitats and Birds, respectively.

    Procurement

    The promoter is a private entity not operating in the utilities sector, thereby not obligated to follow public procurement procedures.

    Status

    Approved - 21/03/2024

    Milestone
    Under appraisal
    Approved
    21 March 2024

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Sweden Industry