Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20190894
    Release date: 14 April 2020

    Promoter – Financial Intermediary

    LANDESANSTALT SCHIENENFAHRZEUGE BADEN-WUERTTEMBERG

    Location

    Description

    The project consists of the acquisition of 120 new trainsets for regional rail services in Baden-Württemberg and the retrofitting with European Railway Traffic Management Systems (ERTMS) and Automatic Train Operation (ATO) equipment of 118 existing vehicles.

    Objectives

    The project will increase the supply and quality of the passenger transport services provided in Baden Württemberg, and thereby will promote sustainable transport solutions in line with EU objectives.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 850 million

    Total cost (Approximate amount)

    EUR 1950 million

    Environmental aspects

    The project consists of the acquisition of new rolling stock, which is out of the scope of the Environmental Impact Assessment (EIA) Directive (2014/52/EU amending 2011/92/EU), the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC). The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) and arrangements for the scrapping of dismissed rolling stock will be assessed during appraisal. The project will promote a modal shift from road to rail and, therefore, generate environmental and safety benefits.

    Procurement

    The promoter has to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Status

    Signed - 30/07/2020

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Germany Transport