    € 90,000,000
    Countries
    Sector(s)
    Italy : € 90,000,000
    Transport : € 90,000,000
    Signature date(s)
    16/12/2021 : € 90,000,000

    Summary sheet

    Release date
    28 December 2021
    Status
    Reference
    Signed | 16/12/2021
    20190733
    Project name
    Promoter - financial intermediary
    BOLOGNA AIRPORT DEVELOPMENT PLAN
    AEROPORTO GUGLIELMO MARCONI DI BOLOGNA SPA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 90 million
    EUR 198 million
    Location
    Sector(s)
    Description
    Objectives

    The project comprises a number of investments at Bologna Guglielmo Marconi Airport (Bologna Airport, BLQ) that are aimed at increasing operational resilience and passenger service standards and improving safety and security performance at the airport. It will also provide additional terminal and landside capacity in order to accommodate traffic growth. In particular, the project includes the renewal and upgrade of the existing terminal facilities, a new apron and a de-icing pad, the renovation of the existing runway system, the acquisition of Explosive Detection Systems (EDS) equipment meeting Standard 3 (S3), the upgrade of the cargo facilities, a multi-storey car park and other minor investments.

    Bologna Airport is the seventh busiest airport in Italy. It is one of the TEN-T core network airports and is included in Baltic-Adriatic, the Mediterranean and the Scandinavian-Mediterranean corridors. The project will provide additional terminal, airside and landside capacity at the airport in order to accommodate further growth in traffic and to improve operational resilience and passenger service standards.

    Additionality and Impact

    The project increases the airport's resilience and the level of service and provides additional airport capacity to accommodate future traffic growth at Bologna airport, which is part of the core network of the Trans-European Transport Network for airports, making the project eligible under Article 309 (c), common interest. Without the project, passengers will endure congestion and would eventually need to follow inefficient travel arrangements, such as travelling at less preferred times or through alternative, less preferred airports. Either way such diversion would impose time delays and other costs to passengers, not reflected in airport charges, constituting a market failure, which will increase over time as demand grows.


    From a financial point of view, the Bank's loan will provide a valuable contribution to complement available resources, accelerating implementation of the Project. The tenor and other terms of the Bank's financing are currently not available at comparable conditions on the market, and ensure an alignment to the economic life of the asset to be financed. In addition, the lower cost of the Bank's financing improves the affordability of the Project as a whole. The EIB funding would send a strong signal to the market about its financial viability. 


    Environmental aspects
    Procurement

    All project components are included in the Bologna Airport 2016-2030 Masterplan, which is an updated and revised version of a former 2009-2023 Master Plan. The 2009-2023 Master Plan was submitted to an Environmental Impact Assessment (EIA) process, which was approved by the Italian Ministry of Environment (MoE) on the 25th February 2013. As per the provisions of the Directive 2014/52/EU amending the EIA Directive 2011/92/EU, the Competent Authority screened out from a further EIA process the updated 2016-2030 Masterplan on the 26th November 2018.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, where applicable, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Comments

    n/a

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - BOLOGNA AIRPORT DEVELOPMENT PLAN - Integrazioni volontarie al progetto e al SIA
    Publication Date
    5 Jan 2022
    Document language
    Main Topic
    Lending
    Document Number
    131792481
    Document Focus
    Environmental Information
    Project Number
    20190733
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - BOLOGNA AIRPORT DEVELOPMENT PLAN
    Publication Date
    5 Jan 2022
    Document language
    Main Topic
    Lending
    Document Number
    142498818
    Document Focus
    Environmental Information
    Project Number
    20190733
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - BOLOGNA AIRPORT DEVELOPMENT PLAN - Aeroporto di Bologna - Masterplan 2009-2023 - Documentazione - Valutazioni e Autorizzazioni
    Publication Date
    5 Jan 2022
    Document language
    Main Topic
    Lending
    Document Number
    152796297
    Document Focus
    Environmental Information
    Project Number
    20190733
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - BOLOGNA AIRPORT DEVELOPMENT PLAN - Sintesi Non Technica
    Publication Date
    16 Oct 2021
    Document language
    Main Topic
    Lending
    Document Number
    131798694
    Document Focus
    Environmental Information
    Project Number
    20190733
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - BOLOGNA AIRPORT DEVELOPMENT PLAN - Quadro di riferimento ambientale
    Publication Date
    5 Jan 2022
    Document language
    Main Topic
    Lending
    Document Number
    131797056
    Document Focus
    Environmental Information
    Project Number
    20190733
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications