Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20130366
Release date: 4 June 2014

Promoter – Financial Intermediary

REGIE DE DISTRIBUTION ET DE PRODUCTION DE L’EAU ET DE L’ELECTRICITE

Location

Description

The Jiji and Mulembwe Hydropower Project consists of the construction of two run-of-the-river hydropower plants Jiji (31.5 MW) and Mulembwe (16.5 MW) in southern Burundi as well as an 80 km 110 kV transmission line to evacuate the power to the capital Bujumbura, which is interconnected at national and regional level. The project also includes the supply of electricity to rural communities in the vicinity of the power plants.

Objectives

The project will almost double the installed power capacity in Burundi, allowing increased access to electricity from a current level of around 4% of the population. The project will contribute to increased supply, reliability and affordability of electricity thus directly contributing to improving living standards, economic activity, growth and development.

Sector(s)

  • Energy - Electricity, gas, steam and air conditioning supply

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Proposed EIB finance (Approximate amount)

EUR 98 million

Total cost (Approximate amount)

EUR 199 million

Environmental aspects

The project is subject to a comprehensive ESIA, in line with the principles of EU legislation, including formal public consultation. The project is not expected to have a significant effect on any protected or environmentally-sensitive areas, including bird migration routes. Up to 221 households are expected to require resettlement, mostly as a consequence of the new transmission line. Appropriate compensation will be provided to people affected by the project in accordance with national legislation and lenders’ requirements.

Procurement

The Bank will require the promoter to ensure that implementation of the project will be carried out in accordance with the Bank’s Guide to Procurement.

Status

Signed - 11/12/2014

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Burundi Energy