Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20090366
    Release date: 19 August 2009

    Promoter – Financial Intermediary

    Torresol Energy Investments

    Location

    Description

    The project concerns the construction and operation of 2 solar thermal power generation plants, each with a capacity of 50 MW and using molten salt storage technology; located near Cadiz (Andalusia / Spain).

    Objectives

    The development of renewable energy will support EU and national targets for renewable energy generation and contribute to environmental and security of energy supply objectives. Electricity generation from concentrated solar power will displace fossil fuel-fired generation and the associated emissions of greenhouse gases and other emissions (SO2, NOx).

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 330 million.

    Total cost (Approximate amount)

    Approximately up to EUR 660 million.

    Environmental aspects

    By virtue of its technical characteristics the project falls under Annex II of Directive 85/337/EC, as amended by 97/11/EC and 2003/35/EC, which leaves the requirement for an Environmental Impact Assessment (EIA) to be determined by the competent national authorities. In this case the Spanish authorities have required an EIA to be carried out. The outcome of the EIA procedure was favourable and the environmental authorisation was awarded in May 2009. Details of the environmental assessment procedures applied will be reviewed by the Bank during appraisal to verify compliance with the Bank’s environmental policy.

    Procurement

    Neither the promoter nor the special purpose companies are subject to EU Procurement Directives. Suitable procurement procedures, including an appropriate selection of works, goods and services offered at competitive prices should be applied in the project’s best interests. Details will be verified during appraisal.

    Status

    Signed - 21/07/2011

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Energy