Release date: 24 June 2008
Promoter – Financial Intermediary
The National Road and Motorways Authority (GDDKiA)Location
Description
Design, Build, Finance and Operate concession contract for about 180 km of new 2x2 motorway between Strykow in the outskirts of Lodz and Pyrzowice in the outskirts of Katowice on a mixture of new and old alignment.
Objectives
This section of the A1 lies on the TEN-T Priority Axis Project Number 25, motorway axis Gdansk-Brno/Bratislava-Wien.
Sector(s)
Proposed EIB finance (Approximate amount)
Up to 50% of senior debt, however not higher than 50% of the Project costs.
Total cost (Approximate amount)
To be determined
Environmental aspects
The project falls under Annex I of EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC and 92/42/EEC Habitats Directive. A detailed analysis of the impact and mitigation measures will be performed during appraisal.
Procurement
During appraisal, the Bank will review the procurement procedures and their conformity to the provisions of Directive 2004/18/EC.
Status
Signed - 26/11/2010
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).