Search En menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20040329
Release date: 28 April 2005

Promoter – Financial Intermediary

Ministry of Transport and Communication, Road Directorate

Location

Description

Construction of a 29 km long 4-lane motorway between Banja Luka, the capital of Republika Srpska, and Corridor X, including a bridge over river Sava.

Objectives

Improvement of national and regional transport links with neighbouring countries, reduction of traffic congestion, alleviation of air and noise pollution on the existing road, and better prospects for the residential, industrial and commercial development in the region.

Sector(s)

Proposed EIB finance (Approximate amount)

Up to EUR 65 million.

Total cost (Approximate amount)

Up to EUR 130 million.

Environmental aspects

Designs for the construction of a new motorway will ensure that proper attention is given to all environmental concerns in line with the Bank’s guidelines.

Procurement

Procurement procedures will be on the basis of international competitive bidding in line with the Bank’s guidelines.

Status

Signed - 17/11/2005

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Bosnia and Herzegovina Transport