Release date: 20 June 2003
Promoter – Financial Intermediary
Generalitat de Catalunya
Beneficiary: Infraestructures Ferroviàries de Catalunya
Location
Description
Construction of a new 43 km metro line (L – 9) in the Metropolitan area of Barcelona. The project is included in the Plan Director de Infrastructuras (PDI 2001 – 2010).of the Generalitat de Catalunya.
Objectives
Further improve the integration of the urban public transportation system of Barcelona.
Sector(s)
Proposed EIB finance (Approximate amount)
Up to 50 % of the total project cost.
Total cost (Approximate amount)
Estimated at EUR 2600 million
Environmental aspects
The promoter is required to respect the regulations imposed by EU directives. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection.
Procurement
The promoter is required to respect the Community directives as regards procurement procedures.
Status
Signed - 15/10/2004