Veröffentlichungsdatum: 20 Juni 2003
Projektträger – zwischengeschaltetes Finanzinstitut
Generalitat de Catalunya
Beneficiary: Infraestructures Ferroviàries de Catalunya
Ort
Beschreibung
Construction of a new 43 km metro line (L – 9) in the Metropolitan area of Barcelona. The project is included in the Plan Director de Infrastructuras (PDI 2001 – 2010).of the Generalitat de Catalunya.
Ziele
Further improve the integration of the urban public transportation system of Barcelona.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50 % of the total project cost.
Gesamtkosten (voraussichtlicher Betrag)
Estimated at EUR 2600 million
Umweltaspekte
The promoter is required to respect the regulations imposed by EU directives. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection.
Auftragsvergabe
The promoter is required to respect the Community directives as regards procurement procedures.
Projektstatus
Unterzeichnet - 15/10/2004