Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20130105
    Release date: 12 January 2015

    Promoter – Financial Intermediary

    OMNICANE

    Location

    Description

    Development of an ethanol plant for biofuel purposes with CO2 capture. The key objective of this operation is to add value through the further processing of molasses, itself a by-product of sugar cane processing.

    Objectives

    This project forms part of an adaptation strategy to improve the competitiveness of the local sugar industry by ensuring a fully integrated approach to producing sugar and all of its by-products, thereby fostering the country's economic and social development and contributing to sustainable long-term development. The project encompasses the optimal use of natural resources, production of renewable energy as well as carbon dioxide capture, which are fully in line with EU policies.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 8 million

    Total cost (Approximate amount)

    EUR 23 million

    Environmental aspects

    An existing distillation facility is to be re-located from a town-centre location to an established industrial site with an existing biomass CHP facility, with additional investments to capture CO2 generated by the process to replace imported gas. There will be an on-site waste-water treatment plant and the final by-product will be converted into fertiliser in an associated plant. The nature and scale of the investment are such that it is unlikely that an environmental impact assessment (EIA) would have been required if the plant had been located within the EU. The position in respect of national legislation will be confirmed at appraisal.

    Procurement

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Status

    Signed - 6/12/2013

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Mauritius Agriculture, fisheries, forestry