    Signature(s)

    Amount
    € 650,000,000
    Countries
    Sector(s)
    Spain : € 650,000,000
    Energy : € 650,000,000
    Signature date(s)
    15/07/2025 : € 250,000,000
    18/11/2024 : € 400,000,000
    Other links

    Summary sheet

    Release date
    23 April 2024
    Status
    Reference
    Signed | 18/11/2024
    20240140
    Project name
    Promoter - financial intermediary
    NATURGY REPOWEREU WIND & SOLAR
    NATURGY ENERGY GROUP SA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 1000 million
    EUR 2058 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The project comprises the implementation and operation of a portfolio of solar PV plants, onshore wind farms and, to a lesser extent, battery storage technology with an aggregate capacity of ca. 2.3 GW. This includes both greenfield stand-alone renewable energy plants as well as the repowering and hybridization of existing renewable energy plants. The schemes are located in various regions in Spain.

    The aim is to contribute to reach the national and EU energy and climate goals, namely helping to decarbonise electricity production in the EU by decreasing the reliance on fossil fuels. Hence, the project is eligible under Article 309 point (c) common interest. Most of the Spanish regions where the preliminary portfolio of plants will be developed are classified as EIB Cohesion Priority Regions. Should plants in the project be located in such regions, then parts of the project would also be eligible under Article 309 point (a) "projects for developing less-developed regions".

    Additionality and Impact

    This framework loan (FL) increases renewable energy generation capacity in Spain and includes battery storage technology (stand-alone and hybridization of existing solar PV and onshore wind), which enhances the integration of intermittent renewable energy generation into the grid and reduce power grid curtailment. The FL will address the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation) and the security of supply.


    The FL contributes to the 2030 targets set out in the National Energy and Climate Plan of Spain and the REPowerEU Action Plan. The financing of this Project also contributes to Bank's lending priority objectives on Renewable Energy as well as on Climate Action. 


    The individual schemes will rely on revenues from (i) the spot market and (ii) PPAs, thereby the project improves market efficiency and competition. In terms of results, the schemes are expected to have a positive economic return, considering the economic value of the electricity generated. Therefore, the project will generate a positive social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost of fossil-fuel based alternatives in Spain. On project quality, the schemes are supported by adequate capabilities / governance of the Promoter.


    Overall, the financing through the EIB will strengthen the Promoter's capability to increase its capacity of renewable energy, complement other financing sources and improve its credit risk profile by extending the debt maturity profile. EIB's favourable customised terms are highly appreciated by the Borrower. Therefore, the loan is expected to provide a positive signalling effect in the market and crowd in complementary financing sources.

    Environmental aspects
    Procurement

    The individual plants and most of the ancillary infrastructure fall under Annex II of the )environmental impact assessment (EIA Directive 2011/92/EU amended by the Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. Battery energy storage systems do not fall under any of the annexes of the Directive. New overhead transmission lines for the interconnection of the schemes to the grid, if falling under Annex I due to their technical characteristics, are expected to be subject to an EIA. The promoter will be requested to comply with applicable national and EU legislation.

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the promoter will have to apply those rules.

    Milestone
    Under appraisal
    Approved
    Signed
    28 August 2024
    18 November 2024
    Related documents

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - NATURGY REPOWEREU WIND & SOLAR
    Publication Date
    11 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    213096812
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Zorita I
    Publication Date
    20 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    239127728
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Zorita II
    Publication Date
    20 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    239156472
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Los Mangos
    Publication Date
    20 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227565765
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Ocaña
    Publication Date
    20 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227570228
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR´- Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Zorita I - Documento de Síntesis
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    237221701
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Zorita II - Documento de Síntesis
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    237218279
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Ence Anjújar III
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227554662
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Ence Anjújar I
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227561641
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Ence Anjújar II
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227572810
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica La Romera
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227542447
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Las Encarnaciones
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227563050
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental - Planta Solar Fotovoltaica Sol Morón
    Publication Date
    21 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    227563559
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental de Infraestructuras comunes de evacuación de plantas fotovoltaicas - Informe preliminar de suelos contaminados
    Publication Date
    3 Jan 2025
    Document language
    Main Topic
    Lending
    Document Number
    237207682
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental de Infraestructuras comunes de evacuación de plantas fotovoltaicas
    Publication Date
    3 Jan 2025
    Document language
    Main Topic
    Lending
    Document Number
    237216486
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental de Infraestructuras comunes de evacuación de plantas fotovoltaicas - Autorización de Vías Pecuarias
    Publication Date
    3 Jan 2025
    Document language
    Main Topic
    Lending
    Document Number
    237211633
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental de Infraestructuras comunes de evacuación de plantas fotovoltaicas - Estudio Acústico
    Publication Date
    3 Jan 2025
    Document language
    Main Topic
    Lending
    Document Number
    237226329
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NATURGY REPOWEREU WIND & SOLAR - Estudio de Impacto Ambiental de Infraestructuras comunes de evacuación de plantas fotovoltaicas - Autorización de Vías Pecuarias
    Publication Date
    3 Jan 2025
    Document language
    Main Topic
    Lending
    Document Number
    237214623
    Document Focus
    Environmental Information
    Project Number
    20240140
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Link to source

    News & Stories

    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications