    Amount
    € 78,000,000
    Countries
    Sector(s)
    Zambia : € 78,000,000
    Energy : € 78,000,000
    Signature date(s)
    16/01/2015 : € 78,000,000

    Summary sheet

    Release date
    18 September 2013
    Status
    Reference
    Signed | 16/01/2015
    20120602
    Project name
    Promoter - financial intermediary
    LUSAKA POWER TRANSMISSION AND DISTRIBUTION NETWORK
    ZESCO Ltd
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 78 million
    EUR 189 million
    Location
    Sector(s)
    Description
    Objectives

    The transmission component consists of the construction/upgrading of 100 km transmission lines on 132 kV voltage and of seven 132-330 kV transmission substations. The distribution component comprises the upgrading of the 11-33 kV distribution system with nine 11-33 kV distribution substations and some 200 km of distribution lines and underground cables.

    The purpose of the project is to reinforce and upgrade the power transmission and distribution infrastructure in the Lusaka area. The proposed investment programme will help remove bottlenecks from the current aged power network, thus reducing equipment failure and electricity losses. The project will increase the reliability and quality of domestic power transmission and distribution service in the Lusaka area.

    Environmental aspects
    Procurement

    132 kV transmission lines of this program would fall under definition of EIA directive 2011/92/EU Annex 2 (if situated within EU), and would require the competent Environmental Agency to screen and decide the necessity of ESIAs. The promoter has prepared the ESIA for these 132 kV works. Other works of the project (11 and 33 kV distribution) are not expected to require ESIAs.

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank’s Guide to Procurement.
    The procurement packages are envisaged to be defined considering parallel co-financing with World Bank.

    Other links

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - LUSAKA POWER TRANSMISSION & DISTRIBUTION NETWORK - Minutes of the Scoping meeting
    Publication Date
    21 Sep 2018
    Document language
    Main Topic
    Lending
    Document Number
    84918877
    Document Focus
    Environmental Information
    Project Number
    20120602
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LUSAKA POWER TRANSMISSION & DISTRIBUTION NETWORK - Wayleave Consent form
    Publication Date
    21 Sep 2018
    Document language
    Main Topic
    Lending
    Document Number
    84921693
    Document Focus
    Environmental Information
    Project Number
    20120602
    Sector(s)
    Countries
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - LUSAKA POWER TRANSMISSION & DISTRIBUTION NETWORK
    Publication Date
    21 Sep 2018
    Document language
    Main Topic
    Lending
    Document Number
    84917374
    Document Focus
    Environmental Information
    Project Number
    20120602
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LUSAKA POWER TRANSMISSION & DISTRIBUTION NETWORK - Environmental Impact Statement
    Publication Date
    21 Sep 2018
    Document language
    Main Topic
    Lending
    Document Number
    84917375
    Document Focus
    Environmental Information
    Project Number
    20120602
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LUSAKA POWER TRANSMISSION & DISTRIBUTION NETWORK - Grievance Redress Mechanism
    Publication Date
    21 Sep 2018
    Document language
    Main Topic
    Lending
    Document Number
    84916984
    Document Focus
    Environmental Information
    Project Number
    20120602
    Sector(s)
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications