    Release date
    25 June 2025
    Status
    Reference
    Approved | 23/07/2025
    20250076
    Project name
    Promoter - financial intermediary
    ASTURIAS WATER INFRASTRUCTURE
    CONSORCIO PARA EL ABASTECIMIENTO DE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 67 million
    EUR 177 million
    Location
    Sector(s)
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The project will support the promoter's 2022-2032 Water Supply Investment Programme in Asturias, a region of northwest Spain. The related schemes will mainly focus on water conveyors, interconnections and water treatment infrastructure.

    The aim is to increase the production capacity of water treatment, improve water quality and enhance the resilience of supply services during periods of water scarcity. Ultimately, the objective is ensure that the water needs of the local population and industries are adequately met in both quantity and quality.

    Environmental aspects
    Procurement

    The investment focuses on enhancing the infrastructure of the water supply system to improve its resilience, resulting in positive social benefits. The promoter will be required to comply with the EU Water Framework Directive (2000/60/EC) as well as the related EU and national environmental legislation, notably under the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by the Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC).

    The promoter shall ensure that contracts for the project implementation will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The procurement procedure has not yet been completed and consequently there is no information on the contractor.

    Milestone
    Approved
    23 July 2025
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - ASTURIAS WATER INFRASTRUCTURE
    Publication Date
    19 Aug 2025
    Document language
    Main Topic
    Lending
    Document Number
    246082396
    Document Focus
    Environmental Information
    Project Number
    20250076
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications