    Summary sheet

    Release date
    26 May 2025
    Status
    Reference
    Signed | 24/07/2025
    20240944
    Project name
    Promoter - financial intermediary
    ADIF BARCELONA SANTS STATION MODERNISATION
    ADIF ALTA VELOCIDAD
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 115 million
    EUR 235 million
    Location
    Sector(s)
    Description
    Objectives

    The project will finance the modernisation and upgrade of the multi-modal railway station at Barcelona Sants, serving both high-speed and conventional services (regional and suburban lines). Sants serves as the primary rail terminal in the city, handling over 40 million passengers annually.

    The aim is to improve the space available for rail passengers and optimise the mobility flows. Additionally, the project will expand the building passenger area of the terminal by 30% in order to better serve the growing passenger rail traffic and avoid overcrowding, queuing and loss of comfort. This will allow to better organise departure/arrival flows and improve the intermodally with other public transport modes as well as soft modes through new street-level access points. The project will not include any works on the rail systems that are located on the underground level. The inclusion of other small schemes for safety and accessibility across the network of suburban rail stations in the metropolitan area of Barcelona is under consideration.

    Additionality and Impact

    The Project provides additional capacity for passengers in the main rail station of Barcelona, a critical urban node in the TEN-T. By expanding the available space in the passenger areas of the terminal and improving accessibility to other modes (metro, bus, taxi, soft modes), the Project is expected to avoid queuing and increase the confort, reliability and attractiveness of the rail services, thus catering for traffic growth in both high speed network and suburban services, and preventing modal shift from rail to road.


    The Project is in line with EU's strategy outlined in the European Green Deal and in the Sustainable and Smart Mobility Strategy. It contributes significantly to the EIB's policy objectives of sustainable cities and regions, climate action and environmental protection and is aligned with the EIB's Climate Bank Roadmap 2021-2025 and Transport Lending Policy. It will address sector specific market failures and will result in economic, social and environmental benefits.


    The long tenor and grace period of the EIB loan will help to increase the average life of ADIF AV´s debt therefore reducing its refinancing risk. The flexibility of drawdowns will allow optimising ADIF's strategy to tap capital markets and raise additional funding sources that will co-finance the Project. Overall, EIB financing will contribute to improving the sustainability of ADIF AV´s debt and its capacity to undertake investments as needed.  

    Environmental aspects
    Procurement

    Where and if applicable, and based on a risk-based approach as defined in the EIB Group Environmental and Social Policy, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), and Habitats Directive 92/43/EEC will be checked during appraisal.

    The main contract for works has been awarded to a joint venture of two Spanish companies (Acciona and Copcisa). The Bank will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    Under appraisal
    Approved
    Signed
    25 June 2025
    24 July 2025

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - ADIF BARCELONA SANTS STATION MODERNISATION
    Publication Date
    3 Jul 2025
    Document language
    Main Topic
    Lending
    Document Number
    243203102
    Document Focus
    Environmental Information
    Project Number
    20240944
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications