Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
115 000 000 €
Pays
Secteur(s)
Espagne : 115 000 000 €
Transports : 115 000 000 €
Date(s) de signature
24/07/2025 : 115 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
26 mai 2025
Statut
Référence
Signé | 24/07/2025
20240944
Nom du projet
Promoteur – Intermédiaire financier
ADIF BARCELONA SANTS STATION MODERNISATION
ADIF ALTA VELOCIDAD
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 115 million
EUR 235 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance the modernisation and upgrade of the multi-modal railway station at Barcelona Sants, serving both high-speed and conventional services (regional and suburban lines). Sants serves as the primary rail terminal in the city, handling over 40 million passengers annually.

The aim is to improve the space available for rail passengers and optimise the mobility flows. Additionally, the project will expand the building passenger area of the terminal by 30% in order to better serve the growing passenger rail traffic and avoid overcrowding, queuing and loss of comfort. This will allow to better organise departure/arrival flows and improve the intermodally with other public transport modes as well as soft modes through new street-level access points. The project will not include any works on the rail systems that are located on the underground level. The inclusion of other small schemes for safety and accessibility across the network of suburban rail stations in the metropolitan area of Barcelona is under consideration.

Additionality and Impact

The Project provides additional capacity for passengers in the main rail station of Barcelona, a critical urban node in the TEN-T. By expanding the available space in the passenger areas of the terminal and improving accessibility to other modes (metro, bus, taxi, soft modes), the Project is expected to avoid queuing and increase the confort, reliability and attractiveness of the rail services, thus catering for traffic growth in both high speed network and suburban services, and preventing modal shift from rail to road.


The Project is in line with EU's strategy outlined in the European Green Deal and in the Sustainable and Smart Mobility Strategy. It contributes significantly to the EIB's policy objectives of sustainable cities and regions, climate action and environmental protection and is aligned with the EIB's Climate Bank Roadmap 2021-2025 and Transport Lending Policy. It will address sector specific market failures and will result in economic, social and environmental benefits.


The long tenor and grace period of the EIB loan will help to increase the average life of ADIF AV´s debt therefore reducing its refinancing risk. The flexibility of drawdowns will allow optimising ADIF's strategy to tap capital markets and raise additional funding sources that will co-finance the Project. Overall, EIB financing will contribute to improving the sustainability of ADIF AV´s debt and its capacity to undertake investments as needed.  

Aspects environnementaux
Passation des marchés

Where and if applicable, and based on a risk-based approach as defined in the EIB Group Environmental and Social Policy, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), and Habitats Directive 92/43/EEC will be checked during appraisal.

The main contract for works has been awarded to a joint venture of two Spanish companies (Acciona and Copcisa). The Bank will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
25 juin 2025
24 juillet 2025
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - ADIF BARCELONA SANTS STATION MODERNISATION
Date de publication
3 Jul 2025
Langue
Sujet général
Prêts
Numéro du document
243203102
Thématique du document
Information Environnementale
Numéro du projet
20240944
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes