Summary sheet
The project comprises the expansion and refurbishment of existing geothermal power plants and the extension and renovation of the district heating and electricity distribution networks in the Reykjavik area during 2025-2029.
In line with the EU and national energy policies, the project will ensure the security of supply of renewable energy and hot water, as well as will secure and improve the energy efficiency of the corresponding enabling infrastructure. It will also serve the increase in demand for renewable energy and hot water from future housing developments and infrastructure expansion in the Reykjavik area.
Based on their technical characteristics, the geothermal systems expansion and district heating networks activities fall under Annex II of the Environmental Impact Assessment Directive 2011/92/EU, as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The electricity distribution activities do not fall under any of the annexes of the Directive. Based on available information at this stage, the environmental impacts of the project are expected to be minor and related mainly to noise, vibration, dust, and traffic disruption, and mostly temporary during the construction, which will be mitigated through appropriate site organisation and construction management. Subsurface risks are expected to be well controlled and managed based on the promoter's extensive experience in the area.
As a public undertaking operating in the utility sector of an EEA member state, the Promoter is subject to public procurement and its procurement procedures need to be in line with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/25/EU, where applicable, as well as Directive 92/13/EEC), as transposed in the national legislation, with publication of the tender and award notices in the Official Journal of the European Union, as and where required.
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).
General enquiries and comments
The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.
Media enquiries
Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.
Complaints mechanism
Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.
Zero tolerance against fraud and corruption
The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.
Related publications