Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20220666
Release date: 21 November 2025

Promoter – Financial Intermediary

SCATEC ASA

Location

Description

The project entails the development, implementation and operation of a 100 MW electrolysis plant in Egypt for the production of hydrogen. The produced hydrogen will be used in an ammonia production plant in Ain Sokhna.

Objectives

The aim is to produce Renewable Fuel of Non-Biological Orgin (RFNBO) for the European market and in accordance with EU requirements. In addition, the project intends to decarbonise ammonia production in Egypt by utilising renewable hydrogen as a feedstock instead of grey hydrogen, supporting Egypt's Nationally Determined Contributions (NDC) commitments. The project also intends to contribute to Egypt's National Low Carbon Hydrogen Strategy, which aims to position Egypt as a global renewable hydrogen hub. The project is in line with the EU-Egypt Strategic and Comprehensive Partnership and the priorities outlined in the Multi-annual cooperation program (2021-2027) between EU and Egypt.

Sector(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Proposed EIB finance (Approximate amount)

not disclosed

Total cost (Approximate amount)

not disclosed

Environmental aspects

The related impacts will have to be assessed by the relevant environmental studies for compatibility with the EIB's environmental and social standards. The local authority has already issued the environmental permit for the electrolyser.

Procurement

The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The project seems to be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and 2014/25/EU, hence private sector procurement procedures will apply.

Status

Approved - 10/12/2025

Milestone
Under appraisal
Approved
10 December 2025

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Egypt Industry