Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200644
    Date de publication: 29 janvier 2021

    Promoteur – Intermédiaire Financier

    PPC RENEWABLES SA

    Lieu

    Description

    The project comprises the development, construction and operation of three solar photovoltaic (PV) plants with a total installed capacity of ca 230MWp, in Kozani, West Macedonia prefecture, Greece.

    Additionality and Impact

    Financing this project supports Greek and European efforts for the promotion of electricity generation from renewable energy sources and a just transition. It is fully aligned with EIB policies related to renewable energy and climate change mitigation. The project is one of the largest PV projects developed in Greece, located in the Lignite Center of Western Macedonia, and has secured one of the lowest feed-in-premium tariffs encountered in Greece. Therefore, electricity consumers and the environment are expected to benefit, as are workers in the just transition region that will be able to benefit from new employment opportunities. The project will thus help address multiple market failures and improve social and economic cohesion in Western Macedonia and Greece.
    The Bank is contributing to the fulfilment of the above public policy goals, the implementation of the specific project and the strategy of the promoter by providing a long-term debt facility at optimal terms under a limited recourse Project Finance structure. This financing structure / method is for the first time implemented by the promoter and a successful outcome with the assistance of the Bank, its co-lenders and their advisors will strengthen the capacity of the company to manage complex projects and financing methods, diversifying thus its funding sources for implementing its overall ambitious strategic plan.

    Objectifs

    The project will promote the security of supply in a cohesion region, through renewable energy resources, contributing towards combatting climate change and its impacts. The development of solar energy supports EU and national targets for renewable energy generation and contributes to the Bank's renewable energy, energy efficiency, as well as climate action objectives (climate change mitigation). The PV plants will be installed at the Lignite Center of Western Macedonia, in the Prefecture of Kozani, Greece.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 33 million

    Coût total (montant approximatif)

    EUR 143 million

    Aspects environnementaux

    All the project components (PV plants, ancillary facilities) fall under Annex II of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EC, and have been screened-in by the competent authorities. The environmental impact assessments (EIA) have been completed and the relevant environmental permits have been issued. The environmental procedure followed for the project and the compliance with the relevant EU Directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be reviewed during the appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation (Directive 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 21/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Énergie