Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140610
    Date de publication: 31 août 2016

    Promoteur – Intermédiaire Financier

    PUBLIC ENTITY(IES)

    Lieu

    Description

    The project concerns the new construction, extension, rehabilitation and equipment of 21 technical and technological institutes (TTIs), classified at the post-secondary level of education. It is part of a reform programme aiming to introduce a dual system of vocational and professional training in Ecuador.

    Objectifs

    The project is eligible for EIB co-finance under the external lending mandate in support of the general principles and policy objectives of the European Union. The key objective of the EU Multi-annual Indicative Programme 2014-2017 for co-operation with Ecuador is sustainable and inclusive growth at local level. Improving the supply of skills demanded in local labour markets is a key objective.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 81 million

    Coût total (montant approximatif)

    EUR 191 million

    Aspects environnementaux

    A project with similar characteristics within the EU could be classified under Annex II of Directive 2011/92/EU as amended by Directive 2014/52/EU, thus requiring a decision by the competent authority whether or not a formal environmental impact assessment (EIA) process is required. In an EU member state, schools and technological institutes specifically mentioned in the EIA Directive would not normally require an EIA. However, the projects could be covered by Annex II of the Directive in relation to urban development and thus be subject to an EIA. The need for environmental studies and assessment will be reviewed during the appraisal process.

    Passation des marchés

    The promoter is a public authority. The Bank will require the promoter to ensure that any procurement procedures are applied in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 28/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Equateur Éducation