Recherche Fr menu Banque européenne d’investissement - Logo ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130275
    Date de publication: 20 septembre 2013

    Promoteur – Intermédiaire Financier

    Austrian specialised banks acting in the sector of energy efficiency in buildings. One of the Promoter identified being BAUSPARKASSE DER OESTERREICHISCHEN SPARKASSEN AG.

    Lieu

    Description

    Funding of energy efficiency investments in social and private residential buildings as well as in public buildings, provided that the projects either reach specified energy levels, or are supported by the Republic of Austria and/or Austrian Regions through dedicated grants programs.

    Objectifs

    Energy Efficiency and Renewable Energy Climate Action (transversal)

    Commentaires

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Industrie - Construction

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 270 million

    Aspects environnementaux

    This operation intends to bring environmental benefits by supporting schemes that reduce energy consumption, increase the use of renewable energies and thus help to mitigate climate change. The individual schemes to be financed are likely to be small and are expected to have limited negative environmental impacts. The cumulated impact of sub-projects could instead generate important environmental benefits. The Bank will assess the promoter’s capacity and procedures to ensure compliance with national and European environmental and biodiversity regulations as well as its capacity to support the Bank's Public Disclosure Policy, which aims at facilitating access by the public to environmentally relevant information

    Passation des marchés

    The majority of the schemes are expected to be developed by private entities that are not subject to EU Procurement Directives. For those schemes where public procedures would apply (e.g. public buildings or publicly owned residential buildings), the promoter will be required to confirm that procurement is carried out in line with the requirements for public sector projects under the relevant national and EU legislation, including publication in the OJEU as and where required.

    Statut

    Signé - 17/12/2013

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Autriche Énergie Industrie