Référence: 20110487
Date de publication: 14 avril 2015

Promoteur – Intermédiaire Financier

Ministry of Regional Development, Construction, Housing and Municipal Services of Ukraine

Lieu

Description

Framework loan for the rehabilitation and upgrading of municipal infrastructure in Ukraine

Objectifs

The project will extend the life of critical urban infrastructure in the energy, water and sanitation sectors, reducing losses, improving energy efficiency, reducing the intensity of greenhouse gas (GHG) emissions, and contributing to the security of energy and water supply. The funding will support the country's transition as well as encourage economic and sector reforms and sustainable development.

Commentaires

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Secteur(s)

  • Aménagement urbain - Construction
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
  • Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Garantie au titre du MPE

This operation is covered by the ELM Guarantee.

Montant BEI envisagé (montant approximatif)

EUR 406 million

Coût total (montant approximatif)

EUR 800 million

Aspects environnementaux

The operation will focus on urban infrastructure projects with limited negative environmental impacts. Environmental pre-screening of the projects, including connection infrastructure where applicable, will be required. Ex-ante approval of the allocations by the Bank will be required to ensure compliance with the Bank's environmental and social standards including those on emission performance standards and those on the protection of sites of nature conservation, where applicable.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

Signé - 23/07/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Ukraine Aménagement urbain Énergie Eau, assainissement Déchets solides