    Référence: 20110466
    Date de publication: 8 février 2013

    Promoteur – Intermédiaire Financier

    MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE

    Lieu

    Description

    The project comprises the financing, design and construction of phase 1 of a new passenger terminal building at Zagreb Airport in Croatia. The existing terminal is already operating in excess of its design capacity. The intention is to use the existing one for other purposes and replace it with a new one, which will provide sufficient handling capacity for projected demand into the mid to longer term. The project is to be awarded under a 30-year concession, which will also include the obligation to operate, develop and maintain the rest of the airport over the concession period too.

    Objectifs

    Zagreb Airport provides an important gateway to Croatia for travellers from other parts of Croatia, the EU and beyond. It facilitates business contacts and tourism and is therefore one of the prerequisites for the economic development of this accession country. Zagreb is at the crossroads of the two important Pan-European Corridors V and X. The project is expected to bring benefits in terms of improved safety, reduced congestion and time savings for travellers.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 245 million

    Aspects environnementaux

    The project is classified under Annex II of the Environmental Impact Assessment (EIA) Directive 85/337/EC as amended by Directives 97/11/EC and 2003/35/EC. The EIA Directives and the SEA Directive have been fully transposed into Croatian legislation. An EIA has been commissioned by Zagreb Airport Ltd. in July 2011 upon instruction of the Grantor and completed in June 2012. Mandatory public consultation was conducted in July 2012. The EIA has been passed to the successful concessionaire for use in applying for the Location Permit, which has been obtained in December 2012, and ultimately for the Construction Permit. It will be a condition of the Bank’s financing that all necessary permits are in place and that all relevant declarations are received from the Competent Authority.

    Passation des marchés

    In accordance with the Public Procurement Act of January 2008 (which transposed the EU Procurement Directives into national law), the Notice of Intention to Grant a Concession was published in the Croatian National Gazette. In parallel, the same Notice was published in the Financial Times. As a result, wide international interest was generated and a number of consortia were shortlisted through a prequalification process. As part of the Bank’s appraisal process, the prequalification process will be reviewed, together with the procedures adopted for the award of the concession to check for compliance with the Bank’s Guide to Procurement.

    Statut

    Signé - 30/11/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.