    Référence: 20090304
    Date de publication: 18 mai 2009

    Promoteur – Intermédiaire Financier

    National Roads and Motorways Authority (GDDKiA)

    Lieu

    Description

    The project consists of the construction on a new alignment of two sections of dual two lane motorway and associated access roads in Southern Poland as follows (i) approximately 36 km of A1 motorway between Pyrzowice and Maciejow and (ii) approximately 135 km of A4 motorway between Szarow and Rzeszow plus 5 km of S19 to access Rzeszow.

    Objectifs

    A1 lies on the priority TEN-T axis Project Number 25, motorway Gdansk-Brno/Bratislava-Wien and A4 is a TEN-T.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 1 250 million.

    Coût total (montant approximatif)

    EUR 2 500 million.

    Aspects environnementaux

    Both sections of the project fall under Annex I of EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC. Hence, an EIA is mandatory for both the proposed motorway investments. The concerned motorway sections are known to cross or be in the vicinity of at least five Natura 2000 sites and there are potentially other protected areas that may be impacted. The provisions of the Habitats Directive will therefore apply. During appraisal, the Bank will review the EIA process adopted to date, in particular the history of the analysis of alignment alternatives and the public consultations carried out, to confirm that it complies with applicable domestic legislation, the EU Directives (including Habitats and Birds Directives) and any relevant international conventions to which Poland is party.

    Passation des marchés

    The construction works and associated supervision are to be procured through restricted tender after international advertisement. Advertisements in the OJEU have already been placed for many of the lots and the remainder are expected to be advertised in the coming months. All procurement is expected to be complete by early 2010. During appraisal, the Bank shall review the arrangements.

    Statut

    Signé - 22/06/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).