Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20040461
Release date: 11 April 2005

Promoter – Financial Intermediary

Société Nationale des Autoroutes du Maroc.

Location

Description

Second tranche of a loan for construction of the Settat-Marrakesh motorway section.

Objectives

The project consists of construction of the Settat-Marrakesh motorway, which will form part of the Casablanca-Marrakesh link constituting the first section of the North/South route (the Casablanca-Settat stretch was opened to traffic in June 2001).

This is the second tranche of an EIB loan to ADM, the first tranche having been deployed satisfactorily with all project-related conditions fulfilled.

Sector(s)

Proposed EIB finance (Approximate amount)

Up to EUR 70 million from the Bank's own resources under the EUROMED II Mandate.

Total cost (Approximate amount)

Approximately EUR 408 million.

Environmental aspects

In accordance with the conclusions of the Autoroutes du Maroc IV project appraisal, the promoter will maintain its undertaking to implement an action plan based on the proposals contained in the environmental studies, in particular, (i) adjustment of the technical characteristics of the motorway sections, and (ii) specific measures for the Settat (by-pass) to Skhour Rhamna section (61 km) and the Oum Er Rbia valley crossing.

Procurement

The different components of the project will put out to public tender in accordance with the EIB’s Guide to Procurement, with publication in the OJEU where required.

Status

Signed - 17/06/2005

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Morocco Transport