Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 25,000,000
    Countries
    Sector(s)
    Spain : € 25,000,000
    Transport : € 25,000,000
    Signature date(s)
    30/05/2022 : € 25,000,000

    Summary sheet

    Release date
    11 March 2022
    Status
    Reference
    Signed | 30/05/2022
    20210540
    Project name
    Promoter - financial intermediary
    ICF BARCELONA ROLLING STOCK
    INSTITUT CATALA DE FINANCES
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 25 million
    EUR 51 million
    Location
    Sector(s)
    Description
    Objectives

    Financing the acquisition of eight electric trainsets to be operated in the underground network of the city of Barcelona by the municipal operator Ferrocarrils Metropolitans de Barcelona.

    The project is part of the rolling stock renewal proposal included in the Infrastructure Master Plan 2021-2030 of Barcelona's Metropolitan Area. The project generates good economic and social benefits, improving reliability and availability of public transport services, potentially reducing the use of private cars in the city and thus minimising transport externalities including noise, pollution and CO2 emissions.

    Additionality and Impact

    The project consists of the acquisition of 8 electric trainsets to be operated in the underground network of the city of Barcelona by the municipal operator Ferrocarrils Metropolitans de Barcelona. This acquisition is part of the rolling stock renewal proposal included in the Infrastructure Master Plan 2021-2030 of Barcelona's Metropolitan Area. The project generates good economic and social benefits, improving reliability and availability of public transport services potentially reducing the use of private cars in the city and thus minimizing transport externalities including noise, pollution and CO2 emissions. Overall, after completion the project is expected to serve around 84 million passengers per year. In addition, the project is rated as having a "Significant Impact" on Gender Equality Tag.

    EIB is supporting with long-term finance the participation of the regional promotional bank as intermediary in this operation. The terms and conditions offered would not be matched by other financiers, in particular the long tenor and availability period which are features aligned with the project implementation and economic life of the asset being financed. These will allow the intermediary to maintain a sound and balanced financial structure by matching the tenor of the EIB loan with that of the final Beneficiary.

    Providing terms and conditions aligned with the project, such as long grace periods and flexible draw-down conditions, will allow the intermediary to offer better terms to the public rail operator, directly reducing transfers from the public administration.

    Environmental aspects
    Procurement

    The acquisition of new rolling stock (metros) does not fall within the scope of the EIA Directive 2014/52/EU (amending Directive 2011/92/EC). Therefore, no environmental impact assessment (EIA) will be required. The Bank will review the compliance with relevant EU directives and will require the Promoter to follow applicable environmental EU legislation.

    The Bank requires the Promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU (repealing 2004/17/EC) and/or 2014/24/EU (repealing 2004/18/EC) as well as Directive 2007/66/EC (amending Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - ICF BARCELONA ROLLING STOCK
    Publication Date
    27 Apr 2022
    Document language
    Main Topic
    Lending
    Document Number
    148806138
    Document Focus
    Environmental Information
    Project Number
    20210540
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - ICF BARCELONA ROLLING STOCK
    Publication Date
    30 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    238617198
    Document Focus
    Environmental Information
    Project Number
    20210540
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications