Signature(s)
Fiche récapitulative
- Transports - Transports et entreposage
Financing the acquisition of eight electric trainsets to be operated in the underground network of the city of Barcelona by the municipal operator Ferrocarrils Metropolitans de Barcelona.
The project is part of the rolling stock renewal proposal included in the Infrastructure Master Plan 2021-2030 of Barcelona's Metropolitan Area. The project generates good economic and social benefits, improving reliability and availability of public transport services, potentially reducing the use of private cars in the city and thus minimising transport externalities including noise, pollution and CO2 emissions.
The project consists of the acquisition of 8 electric trainsets to be operated in the underground network of the city of Barcelona by the municipal operator Ferrocarrils Metropolitans de Barcelona. This acquisition is part of the rolling stock renewal proposal included in the Infrastructure Master Plan 2021-2030 of Barcelona's Metropolitan Area. The project generates good economic and social benefits, improving reliability and availability of public transport services potentially reducing the use of private cars in the city and thus minimizing transport externalities including noise, pollution and CO2 emissions. Overall, after completion the project is expected to serve around 84 million passengers per year. In addition, the project is rated as having a "Significant Impact" on Gender Equality Tag.
EIB is supporting with long-term finance the participation of the regional promotional bank as intermediary in this operation. The terms and conditions offered would not be matched by other financiers, in particular the long tenor and availability period which are features aligned with the project implementation and economic life of the asset being financed. These will allow the intermediary to maintain a sound and balanced financial structure by matching the tenor of the EIB loan with that of the final Beneficiary.
Providing terms and conditions aligned with the project, such as long grace periods and flexible draw-down conditions, will allow the intermediary to offer better terms to the public rail operator, directly reducing transfers from the public administration.
The acquisition of new rolling stock (metros) does not fall within the scope of the EIA Directive 2014/52/EU (amending Directive 2011/92/EC). Therefore, no environmental impact assessment (EIA) will be required. The Bank will review the compliance with relevant EU directives and will require the Promoter to follow applicable environmental EU legislation.
The Bank requires the Promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU (repealing 2004/17/EC) and/or 2014/24/EU (repealing 2004/18/EC) as well as Directive 2007/66/EC (amending Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes