Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Summary sheet

    Release date
    3 December 2024
    Status
    Reference
    Approved | 04/02/2025
    20190547
    Project name
    Promoter - financial intermediary
    TRANVIA ALCALA DE GUADAIRA
    COMUNIDAD AUTONOMA DE ANDALUCIA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 41 million
    EUR 130 million
    Location
    Sector(s)
    Description
    Objectives

    The project concerns the railway installations (power supply, signalling, passenger's information systems and telecommunications), plus the architectural works for the 12 tramway stops, the new depot and the necessary rolling stock (6 tram sets, of 5 carriageways each). It is important to note is that the civil works and the track works for this future tramway line are already built.

    The project supports investments in sustainable urban public transport (new tram line), which are expected to reduce transport externalities such as air pollution and greenhouse gas emissions, decrease travel times for the tramway users as well as road traffic congestion in the area, by promoting modal shift from private car users to public transport. In addition, being fully located within a less developed region of the EU, the project supports the strengthening of the EU's economic, social and territorial cohesion.

    Additionality and Impact

    The Project concerns the completion of the tramway system in the city of Alcala de Guadaira, including depot infrastructure, rolling stock acquisition and associated tramway systems. 

    The Project complies with the Bank's Paris Alignment criteria as defined in the Climate Bank Roadmap and is fully consistent with the EIB Transport Lending Policy. The Project's contribution to the Bank's Climate Action and environmental sustainability objective is 100%.


    The Project is expected to increase accessibility to the public transport network and also improve the reliability of the public transport service, which in turn is expected to reduce negative externalities of road traffic, improve air quality and reduce Green House Gas emissions from transport in Seville metropolitan area. Also providing better access to job and educational opportunities to the population served by this new public transport infrastructure.


    Finally, EIB's financing provides the client long tenors and flexible loan conditions, such as long grace and disbursement periods, which are therefore better adapted to the implementation of the Project. EIB's financing also allows the Promoter to achieve diversification of funding sources and contributes to the stability of their financing needs.

    Environmental aspects
    Procurement

    The project, to be appraised and monitored in line with the EIB's policies, including the Environmental and Social Sustainability Framework, will contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation. Project falls within the projects listed in Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, amended by EIA Directive 2014/52/EU. A formal EIA was prepared for the project and following with that, after the public consultation process, the environmental Competent Authority issued the environmental permit. Therefore, during appraisal, the EIB will check the compliance with the requirements of the Directive 2011/92/EU, amended by EIA Directive 2014/52/EU. Additionally, and as applicable, the EIB will review compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC and the relevant Habitats and Birds Directives (92/43/EEC and 2009/147/EC, respectively).

    The promoter has to ensure that contracts for implementation of the Project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    Approved
    4 February 2025
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - TRANVIA ALCALA DE GUADAIRA - Calificación Ambiental - Documento de síntesis
    Publication Date
    23 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    182861150
    Document Focus
    Environmental Information
    Project Number
    20190547
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - TRANVIA ALCALA DE GUADAIRA - Estudio Ambiental - Medidas Preventivas y Correctoras. Mitigación y Adaptación al Cambio Climático y Resiliencia a las Catástrofes
    Publication Date
    23 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    216856165
    Document Focus
    Environmental Information
    Project Number
    20190547
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - TRANVIA ALCALA DE GUADAIRA
    Publication Date
    11 Feb 2025
    Document language
    Main Topic
    Lending
    Document Number
    214751518
    Document Focus
    Environmental Information
    Project Number
    20190547
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications