Release date: 3 December 2024
Promoter – Financial Intermediary
COMUNIDAD AUTONOMA DE ANDALUCIALocation
Description
The project concerns the railway installations (power supply, signalling, passenger's information systems and telecommunications), plus the architectural works for the 12 tramway stops, the new depot and the necessary rolling stock (6 tram sets, of 5 carriageways each). It is important to note is that the civil works and the track works for this future tramway line are already built.
Objectives
The project supports investments in sustainable urban public transport (new tram line), which are expected to reduce transport externalities such as air pollution and greenhouse gas emissions, decrease travel times for the tramway users as well as road traffic congestion in the area, by promoting modal shift from private car users to public transport. In addition, being fully located within a less developed region of the EU, the project supports the strengthening of the EU's economic, social and territorial cohesion.
Sector(s)
- Transport - Transportation and storage
Proposed EIB finance (Approximate amount)
EUR 41 million
Total cost (Approximate amount)
EUR 130 million
Environmental aspects
The project, to be appraised and monitored in line with the EIB's policies, including the Environmental and Social Sustainability Framework, will contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation. Project falls within the projects listed in Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, amended by EIA Directive 2014/52/EU. A formal EIA was prepared for the project and following with that, after the public consultation process, the environmental Competent Authority issued the environmental permit. Therefore, during appraisal, the EIB will check the compliance with the requirements of the Directive 2011/92/EU, amended by EIA Directive 2014/52/EU. Additionally, and as applicable, the EIB will review compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC and the relevant Habitats and Birds Directives (92/43/EEC and 2009/147/EC, respectively).
Procurement
The promoter has to ensure that contracts for implementation of the Project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Status
Under appraisal