    Reference: 20230228
    Release date: 2 October 2023

    Promoter – Financial Intermediary

    E-DISTRIBUZIONE SPA

    Location

    Description

    The project will finance the second phase of the implementation of an advanced electricity metering system throughout ENEL's concession areas in the period 2023-2024.

    Additionality and Impact

    The Project contributes to the Bank's lending priority objectives on "Climate Action and Environmental Sustainability" and aligns with the REPowerEU objectives. Its financing will contribute to the "Energy Lending Policy" theme on "innovative technologies and "new types of energy infrastructure". Moreover, the Project is in line with Italy's NECP (National Energy and Climate Plan), which aims to enable and develop demand response, including via dynamic pricing.

    The Project can help address the market failure represented by incomplete markets (provision of real time information to end-customers) and it can improve energy efficiency by reducing overall electricity consumption. Economic benefits include energy savings, the avoided costs of replacing less-advanced meters and concentrators, better complaint management, the possibility of new retail services and the participation of end-user in demand response services.

    About 41% of the investments will be in cohesion priority regions.

    The EIB financing brings a significant financial value added by lowering the Project's cost of funding and offering a tenor longer than the one normally available in the market. The value added provided by the EIB is even more tangible under the current market conditions, perturbed by the Russia-Ukraine conflict.

    Objectives

    The aim is to replace the currently installed remotely manageable electricity meters with a further advanced electricity metering system.

    Sector(s)

    • Energy - Electricity, gas, steam and air conditioning supply

    Proposed EIB finance (Approximate amount)

    EUR 500 million

    Total cost (Approximate amount)

    EUR 713 million

    Environmental aspects

    No significant environmental impacts expected. The EIB will evaluate the environmental aspects of the project and will review the relevant promoter's procedures applied to implement the project to ensure that they are in line with EU standards and good industry practice.

    Procurement

    The promoter has to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/17/EC, and 2014/25/EU where applicable, as well as Directive 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Status

    Signed - 22/09/2023

    Milestone
    Under appraisal
    Approved
    Signed
    7 August 2023
    22 September 2023

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Italy Energy