    Reference: 20220345
    Release date: 27 October 2022

    Promoter – Financial Intermediary

    JOO GROUP OY

    Location

    Description

    The project will finance new high-energy performance residential buildings in Finland.

    Additionality and Impact

    Given the focus of the operation on the construction of new and affordable high energy performance residential buildings, the underlying investments will support the EU's and Bank's priority in the energy sector (energy efficiency and renewable energy) and the EIB's climate action objectives. Finland has implemented the Nearly-Zero Energy Building standard. However, the building construction norms are not yet aligned with Net-Zero standard, and there is room for further efficiency improvements. This operation will contribute to the achievement of Finland's Integrated Energy and Climate Plan targets.

    Through energy savings, energy efficiency projects reduce carbon emissions and air pollution, increase comfort, air quality in the buildings, and reduce dependency on energy imports, social and public benefits that are not fully internalised by private investors.

    The project has a good Economic Rate of Return and will generate good social benefit.

    In addition with the sub-projects in Tampere and Turku, the project will contribute to Cohesion policy objective.

    The EIB support to this operation is expected to provide tangible financial benefit, positively contributing to the implementation of the Promoter's investment pipeline of energy efficient buildings. The EIB loan will diversify the borrower's funding sources and provide a loan tenor for senior unsecured financing, which is not available from commercial sources. The EIB loan's flexible disbursement features provide further benefit to the Promoter in sequencing construction related cash outflows in optimal manner. The Bank's support would have a positive signalling effect to other financiers, crowding-in other debt financing to this project as well as to other growth capex financing needs of the Promoter. The EIB loan is subordinated to the Borrower's senior secured financing.


    Objectives

    The aim is to support the national strategy to develop low-energy consumption buildings, to be significantly below the level required for residential buildings in Finland.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 100 million

    Total cost (Approximate amount)

    EUR 266 million

    Environmental aspects

    Given the relative scale, location and nature of the project in built-up urban areas, all of the buildings are deemed not to have any significant negative environmental or social impact. Exceptionally, a building may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by the Directive 2014/52/EU). In such cases the EIB requires the promoter to act according to the provisions of the aforementioned Directive leaving it to the competent authority to decide in line with the Directive whether an EIA procedure is needed or not. The Bank will review relevant permits public consultations and authorization processes during appraisal, including mitigation measures to be taken. Through the project, a new high energy performance building, as per the requirements of the Energy Performance of Buildings Directive (EPBD) 2010/31/EU, will be constructed and will, after completion, reduce energy consumption and pollutant emissions by going beyond the current near-zero energy building regulation.

    Procurement

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

    Status

    Signed - 20/02/2023

    Milestone
    Under appraisal
    Approved
    Signed
    24 January 2023
    20 February 2023

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Finland Services