Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 70,000,000
    Countries
    Sector(s)
    Morocco : € 70,000,000
    Water, sewerage : € 70,000,000
    Signature date(s)
    22/05/2025 : € 70,000,000

    Summary sheet

    Release date
    8 May 2025
    Status
    Reference
    Signed | 22/05/2025
    20220208
    Project name
    Promoter - financial intermediary
    ONEE PRODUCTION EAU POTABLE III AEP3 TRANCHE A
    OFFICE NATIONAL DE L'ELECTRICITE ET DE L'EAU POTABLE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 70 million
    EUR 140 million
    Location
    Sector(s)
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The Project will support drinking water production in Morocco through reinforcement and higher efficiency of production infrastructure.

    The aim is to enhance the quantity and quality of treated water available to users, while improving the efficiency of water production facilities, including optimising energy usage in the production and delivery processes.

    Additionality and Impact

    L'ONEE a proposé ce projet dans un contexte de stress hydrique au Maroc, accentué par les cycles de sécheresse que connaît le pays et la demande croissante en eau des différents usagers. Le projet contribuera à :

    i) La sécurisation et au renforcement des infrastructures de production et d'approvisionnement en eau potable des petits et moyens centres urbains et ruraux gérés par l'ONEE ;

    ii) L'amélioration des performances et l'optimisation des installations de production et de transport de l'eau de l'ONEE. 


    Le projet s'inscrit pleinement dans l'orientation sectorielle de l'eau de la BEI et dans les priorités du mandat Europe Global (NDICI). Il soutient la feuille de route 2021-2025 du Groupe BEI pour le climat.


    Le prêt de la BEI permettra de contribuer au financement des opérations inscrites au niveau du Plan d'Equipement 2025-2030 de l'ONEE approuvé par le Conseil d'Administration du 21 avril 2025.


    Il est attendu que ce prêt apporte des termes de financement convenables au secteur.


    Le projet sera conforme aux normes environnementales, sociales (E&S)et d'approvisionnement de la Banque, dans la mesure permise par le cadre réglementaire environnemental et social national applicable.


    Environmental aspects
    Procurement

    The promoter shall comply with EIB's Environmental and Social standards. No major environmental and social impacts are expected.

    The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

    Comments

    The framework loan will be proposed under Investment Window 1 of the new EU comprehensive guarantee of the Neighbourhood, Development and International Cooperation Instrument / Global Europe (NDICI / Global Europe) mandate. This is subject to the financing amount available for the country at the time of signatures.

    Milestone
    Under appraisal
    Approved
    Signed
    30 April 2025
    22 May 2025

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - ONEE PRODUCTION D EAU POTABLE III (AEP3)
    Publication Date
    9 May 2025
    Document language
    Main Topic
    Lending
    Document Number
    244076375
    Document Focus
    Environmental Information
    Project Number
    20220208
    Sector(s)
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications