Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20190495
    Release date: 12 September 2019

    Promoter – Financial Intermediary

    CITY OF OSTROW WIELKOPOLSKI

    Location

    Description

    The project consists of a Framework Loan intermediated through Bank Gospodarstwa Krajowego, Poland's national development bank, financing eligible schemes implemented under the long-term capital investment programme of the City of Ostrów Wielkopolski, improving sustainable urban development and supporting climate mitigation measures.

    Objectives

    This operation is structured as a framework loan; the EIB will finance eligible schemes from the City's investment plan 2020-2023. Some schemes already identified include: (i) the development of a clean urban energy market (a pilot project aimed at distributing energy from renewable sources to the inhabitants of the municipality); (ii) construction of social housing; and (iii) construction of the new schools. The loan will be either a direct loan to the Promoter, or an intermediated loan through a local bank, including, but not limited to, BGK, the national promotional bank (to be confirmed during appraisal).

    Sector(s)

    • Services - Public administration and defence; compulsory social security

    Proposed EIB finance (Approximate amount)

    PLN 110 million (EUR 24 million)

    Total cost (Approximate amount)

    PLN 220 million (EUR 49 million)

    Environmental aspects

    Promoter's environmental management capacity to properly apply the EU environmental directives (the EU SEA Directive 2001/42/EC, the EU Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EU, as well as the requirements of the EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC, where appropriate) will be assessed during appraisal. The schemes to be proposed under the Framework Loan should have an overall positive impact on the environment, by reducing energy consumption and by promoting sustainable urban development. Some of the schemes may, however, fall under Annex I or Annex II of the Directive 2014/52/EU amending the EIA Directive 2011/92/EU. This will be further assessed during project appraisal.

    Procurement

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU/ 2014/25/EU where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Status

    Signed - 23/07/2020

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Poland Services