Release date: 22 June 2022
Promoter – Financial Intermediary
EDF RENOUVELABLES SA,ENBRIDGE INCLocation
Description
Design, construction, financing and operation of a 24MW floating offshore windfarm located off the coast of Faraman (Provence-Alpes-Côte d'Azur, France).
Objectives
The development of offshore wind energy will support EU and national targets for renewable energy generation and greenhouse gas emission reduction, it thus contributes to environmental objectives. The project will contribute to the Bank's priority objectives for energy sector lending related to renewable energy sources and transversal objectives of climate action. Floating turbines could allow projects to access project sites with better wind resources (for which the fixed-foundation solution would likely be too costly) and generate potential savings with regards to foundations and installation costs. The project is thus likely to contribute to the advance of EU technological leadership in wind energy and therefore support long-term EU economic growth.
Sector(s)
- Energy - Electricity, gas, steam and air conditioning supply
Proposed EIB finance (Approximate amount)
EUR 50 million
Total cost (Approximate amount)
EUR 287 million
Environmental aspects
Following an environmental impact assessment (EIA) process, the project received environmental authorisation in February 2019. The project is located within a Natura 2000 area; an appropriate assessment (AA) concluded that the project is not expected to have a significant negative impact on the integrity of the concerned nature conservation sites.
Procurement
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU), with the publication of tender notices in the Official Journal of the EU, as and where appropriate.
Status
Signed - 16/11/2021
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).