Release date: 22 June 2016
Promoter – Financial Intermediary
LAND BADEN-WUERTTEMBERGLocation
Description
Investment in rolling stock in Baden-Württemberg (Network 12 Ulmer Stern). Sub-operation under programme loan for rolling stock and related infrastructure for local and regional public transport in Baden-Württemberg (2014-0765).
Objectives
The new rolling stock will improve public transport services in the region around the city Ulm. More passengers should be attracted to public transport, resulting in improvements in overall mobility whilst reducing the adverse impact of transport on the environment.
Sector(s)
- Transport - Transportation and storage
Proposed EIB finance (Approximate amount)
EUR 25 million
Total cost (Approximate amount)
EUR 52 million
Environmental aspects
The manufacture of rolling stock does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended. It is not clear yet if any depots are necessary at this stage. As an associated facility a new depot might be necessary. This could fall under Annex II of the EIA Directive, and therefore may be subject to an EIA procedure. German law requires compliance with Directive 2011/92/EU, as amended, to obtain building permits for such elements. If construction of a new facility is required, then the promoter undertakes to inform the Bank on environmental compliance by submitting a copy of the environmental decision and the non-technical summary of the EIA (if applicable), as well as evidence that the requirements of the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC have been fulfilled, if applicable.
Procurement
The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required. Network 12 is published under 2016/S 004-004030, d.d . 07.01.2016.
Status
Signed - 28/03/2017
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).