Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20140234
    Release date: 3 September 2021

    Promoter – Financial Intermediary

    VENEZIANA ENERGIA RISORSE IDRICHE TERRITORIO AMBIENTE SERVIZI - VERITAS SPA

    Location

    Description

    Investments in water distribution services and in wastewater and solid waste collection and treatment services.

    Objectives

    The purpose of the water and wastewater components is to strengthen the continuity of safe water supply, rationalise and secure the collection and treatment of wastewater in line with regulations, and to carry out extraordinary maintenance and efficiency upgrades on the networks and treatment plants. The solid waste investments are expected to contribute to increasing materials recovery from residual waste and diversion of waste from landfills.

    Sector(s)

    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    • Solid waste - Water supply; sewerage, waste management and remediation activities

    Proposed EIB finance (Approximate amount)

    EUR 50 million

    Total cost (Approximate amount)

    EUR 100 million

    Environmental aspects

    The investments are expected to have positive net environmental and social impacts, considering their focus on compliance and resource efficiency. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EC, the Habitats Directive (92/43/EC) and the Birds Directive (2019/147/EC) will be verified during appraisal.

    Procurement

    The Bank will require the Promoter to ensure that contracts for the implementation of the project be tendered in accordance with the relevant applicable EU procurement legislation, [2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC] as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Status

    Signed - 9/07/2014

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Italy Water, sewerage Solid waste