    Release date
    13 December 2013
    Status
    Reference
    Approved | 07/02/2014
    20110586
    Project name
    Promoter - financial intermediary
    OPTIM MOSTY U JABL-CESKY TESIN LINE
    Ministry of Transport of the Czech Republic
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    CZK 1697 million (EUR 62 million)
    CZK 10318 million (EUR 375 million)
    Location
    Sector(s)
    Description
    Objectives

    Optimisation of railway line Mosty u Jablunkova - Bystrice nad Olsi - Cesky Tesin.

    The project is part of the optimisation of the Slovak Republic State Border - Detmarovice railway line, in the Moravian-Silesian Region. The design parameters for the project comply with national standards for the modernisation of railway infrastructure. The project aims at providing the preconditions for considerably improved passenger services and full interoperability and sufficient capacity for freight traffic.

    Environmental aspects
    Procurement

    The project complies with the EU directives relating to environmental protection. Based on a statement issued by the competent Authority, the project is not likely to have significant effects on Natura 2000 sites.

    EU procurement directives have been transposed into Czech legislation by Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The procurement process is accountable under the Cohesion Funds regulations.

    Comments

    -

    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - OPTIM MOSTY U JABL-CESKY TESIN LINE
    Publication Date
    6 Mar 2014
    Document language
    Main Topic
    Lending
    Document Number
    46473664
    Document Focus
    Environmental Information
    Project Number
    20110586
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - OPTIM MOSTY U JABL-CESKY TESIN LINE
    Publication Date
    17 Jun 2014
    Document language
    Main Topic
    Lending
    Document Number
    53220378
    Document Focus
    Environmental Information
    Project Number
    20110586
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - OPTIM MOSTY U JABL-CESKY TESIN LINE
    Publication Date
    11 Nov 2016
    Document language
    Main Topic
    Lending
    Document Number
    67211671
    Document Focus
    Environmental Information
    Project Number
    20110586
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications