Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20110105
    Release date: 7 June 2011

    Promoter – Financial Intermediary

    TERNA S.p.A.

    Location

    Description

    The project is a multi component investment programme aimed at reinforcing and extending the electricity transmission infrastructure of Italy. It consists of twenty components geographically dispersed throughout Italy.

    Objectives

    The main purpose of the project is to promote the development of the electricity transmission network of Italy, support the integration of renewable generation resources, reduce congestion and improve security of supply through the creation of internal transmission capacity, rationalisation and better operation of the existing network.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 325 million

    Total cost (Approximate amount)

    Up to EUR 810 million

    Environmental aspects

    Three project components, out of the planned twenty, require Environmental Impact Assessment. The impacts that can be typically expected for them are visual impact, electromagnetic fields, disturbance during construction and impact on flying vertebrates. Experience with previous operations has proven the environmental capability of the promoter.

    Procurement

    The promoter follows public procurement procedures in accordance with the Directive 2004/17/EC and with the Italian Public Procurement Act (Dlgs. 163/06).

    Status

    Signed - 25/07/2011

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Italy Energy