    Reference: 20100544
    Release date: 24 September 2015

    Promoter – Financial Intermediary

    NEW & RENEWABLE ENERGY AUTHORITY

    Location

    Description

    Construction of a 200 MWe windfarm on the Red Sea coast - at the Gulf of Suez - to supply the national grid

    Objectives

    This renewable energy project is expected to make a significant contribution to both EU and country priorities, in particular with regard to climate action objectives. The project is fully in line with the strategic objectives set for the Bank's external mandate for the Southern Neighbourhood region since it will contribute to reducing the growing electricity supply gap in Egypt using sustainable wind energy resources. The project also directly supports the objectives of the Government of Egypt, which aims to reach a wind energy share of total energy generation of 12% by 2020 under its power sector development strategy.

    Comments

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 115 million

    Total cost (Approximate amount)

    EUR 334 million

    Environmental aspects

    If the project were located within the EU it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), requiring the competent authorities to determine whether an EIA is required. A Strategic Environmental Assessment (SEA) was conducted for the larger region in 2011 ("1000 MW wind farm") covering an area of about 200 km². Based on the SEA, the competent authority has screened the project in and decided that a preliminary impact assessment or "Form B" is required. As the "Form B" is less comprehensive than a full EIA, the Bank will conduct a gap-analysis with respect to its environmental and social standards and decide on complementary measures as required.

    Procurement

    The Bank will require the promoter to ensure that the implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Status

    Signed - 28/03/2017

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Egypt Energy