Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20100316
    Release date: 12 April 2011

    Promoter – Financial Intermediary

    Autoridad Portuaria de Tarragona (APT)

    Location

    Description

    The project consists of the expansion of container / liquid bulk facilities in the port of Tarragona, Spain.

    Objectives

    The project will promote sea transport as an alternative to other modes and will thus contribute to transport sustainability.

    It includes the following 2 components:
    - Expansion of “Muelle de la Química” and,
    - Expansion of “Muelle Andalucía”.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 60 million

    Total cost (Approximate amount)

    Up to EUR 130 million

    Environmental aspects

    The project consists of an expansion of current terminals within the port area. The competent authority has decided that the project would fall under Annex II of the EIA Directive and on the basis of Annex III of the EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC, that no EIA was required.

    Procurement

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been / shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

    Status

    Signed - 5/10/2011

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Transport