Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20090631
    Release date: 23 April 2010

    Promoter – Financial Intermediary

    Administrator Infraestructuras Ferroviarias (ADIF)

    Location

    Description

    The project involves the construction of approximately 252 km high-speed rail line to complete the connection from Madrid to Alicante and Murcia.

    Objectives

    The project will substantially improve travel time between Madrid Albacete, Alicante and Murcia and therefore between Madrid and the regions located in the South-East of Spain.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Indicatively, up to EUR 900 million.

    Total cost (Approximate amount)

    Indicatively, around EUR 4 000 million.

    Environmental aspects

    According to EU Directive 85/337/EEC amended by 97/11/EC and 2003/35/EC, the project falls into the Annex I category and therefore an EIA is mandatory. Compliance with national and EU environmental legislation as well as potential impacts on Natura 2000 network will be verified during appraisal. The project planning predates the SEA Directive 2001/142/EC.

    Procurement

    The promoter has complied with the requirement of publication of tender notices both in the National and EU Official Journal for all the contract notices and all the contract awards (covering design, construction and works supervision contracts) for the Project up to the moment and is expected to do so in the remaining contracts to be procured.

    Status

    Signed - 22/06/2010

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Transport