Reference: 20070106
Release date: 20 November 2007

Promoter – Financial Intermediary

Electricity Supply Board

Location

Description

Design, construction, commissioning and operation of a 431 MWe natural gas-fired combined cycle power plant.

Objectives

To provide new baseload generating capacity to meet rising power demand in Ireland. The construction of this new, efficient, gas-fired plant is part of an overall plant portfolio restructuring programme which includes the closure / divestment of older, less efficient plants throughout Ireland.

Sector(s)

Proposed EIB finance (Approximate amount)

To be decided.

Total cost (Approximate amount)

Around EUR 400 million.

Environmental aspects

Due to the capacity of the plant, the project falls under Annex I of the EIA directive and requires an EIA which was issued in July 2004. The project has received a permission to build and an integrated pollution prevention and control license. With the application of various mitigation measures, the environmental impact of the project is expected to be within acceptable levels.

Procurement

The procurement procedures applied to the project follow the requirements of the EU procurement directive 93/38/EC as amended by 2004/17/EC. The promoter published the tender for the plant in OJEC in 2003 and the award notice was published in OJEC in June 2007.

Status

Signed - 26/11/2008

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).