Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20060324
    Release date: 16 February 2009

    Promoter – Financial Intermediary

    Roads of Serbia
    Vlajkoviceva 19a
    11000 Belgrade
    Serbia

    Location

    Description

    The project concernes the construction of a new motorway between Leskovac and FYROM border. It will be approximately 100 km long, with a cross-section of between 26 and 28 meters and designed for a speed of 100-120 km/h.

    Objectives

    The new highway is expected to be suited to current and estimated future traffic levels, and is also expected to reduce the accident rate, which at present is relatively high.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 300 million.

    Total cost (Approximate amount)

    Around EUR 600 million.

    Environmental aspects

    According to preliminary information, Environmental Impact Assessment (EIA) studies have been carried out. The environmental process and identification and mitigation of possible negative effects on the environment, and to sensitive areas in particular, will be detailed in the appraisal. The environmental and social aspects will be further appraised.

    Procurement

    The Promoter will ensure that any procurement procedures are done in accordance with EIB Guidelines and the relevant applicable EU rules.

    Status

    Signed - 23/10/2009

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Serbia Transport