Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20060249
    Release date: 16 August 2006

    Promoter – Financial Intermediary

    Ministry of Agriculture of the Czech Republic

    Location

    Description

    The project consists of investment schemes for flood protection undertaken as part of the National Flood Prevention Strategy. The proposed scope includes investments in all major Czech river basins, as well as the rehabilitation, de-sludging and upgrading of existing pond systems, to better utilise them for retention of flood waves. Schemes will cover the whole country. Their implementation was accelerated further to the 2006 floods.

    Objectives

    The project aims at implementing the National Flood Prevention Strategy, adopted by the Government in 2000, with the purpose of increasing the level of flood protection in the main urban areas of the country. The aim is achieving the targeted levels of protection and avoiding the effects of the recurrent, widespread floods that hit the country during the last ten years, the most severe of which were recorded in 1997 and 2002.

    Comments

    Social Security.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to CZK 9 000.00 million.

    Total cost (Approximate amount)

    CZK 15 000.00 million.

    Environmental aspects

    All schemes will be screened according to the requirements of applicable Directives, including 97/11/EC, amending 85/337/EEC, and the Natura 2000 and Habitats directives. The Bank will ensure that all schemes to be supported by the loan comply with the relevant EU environmental legislation.

    Procurement

    Contracts will be tendered in accordance with applicable thresholds and procedures of national legislation and EU public procurement legislation, including publication on the OJEU if required (2004/18/EC and 2004/17/EC).

    Status

    Signed - 11/12/2006

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Czech Republic Water, sewerage