    Reference: 20060091
    Release date: 9 August 2006

    Promoter – Financial Intermediary

    EirGrid plc

    Location

    Description

    Upgrading of the national electricity dispatch and control centre for operation of the electricity transmission network, including the purchase of necessary software and hardware, system configuration and consulting services.

    Objectives

    The project will promote the integration of the electricity transmission networks in Ireland and Northern Ireland, which include areas designated as objective 1. The project will support the establishment of the Single Electricity Market for the island of Ireland and will facilitate cross-border trading of electricity, and improve efficiency and security of supply. These benefits are consistent with the EU objectives to promote the interconnection and interoperability of trans-European energy networks and to support the management and rational use of energy.

    Comments

    Electricity, gas and water supply.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to 50% of the project costs.

    Total cost (Approximate amount)

    About EUR 52 million. Some cost variations possible depending on the exact timetable for the project’s implementation.

    Environmental aspects

    The project does not come under the Environmental Directive (85/337/EEC as amended by 97/11/EC). The project has minimal environmental impact as its main components are IT hardware/software at the existing National Control Centre based in Dublin. Any structural changes or additional buildings for the project will be subject to the normal planning/consents from national and local authorities.

    Procurement

    The Promoter has confirmed that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 93/38/EEC as amended by 2004/17/EC), with parallel publication of tender notices in the Official Journal of the EU as and where appropriate. The specific procedures will be further evaluated by EIB.

    Status

    Signed - 21/12/2006

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).