Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20030106
    Release date: 30 November 2004

    Promoter – Financial Intermediary

    Réunion Region

    Location

    Description

    The project (the Route des Tamarins) forms part of the long-term programme to develop the national road network drawn up in the 1980s and made concrete every five years in the Selective Collection of Operations. In particular, it forms part of the general programme to upgrade to 2-lane dual carriageway the RN1 between le Port and St. Pierre on the west side of the island of Réunion. The 33.7 km project will link the existing 2-lane dual carriageway sections of the RN1 in the north (between le Port and St. Paul) and south (from Étang Salé).

    Objectives

    The project is designed to cut journey times, in good comfort and safety conditions, between the economic hub of le Port and St. Pierre on the west coast of the island. It will improve access to the western Heights and ensure the connection with the existing departmental roads that provide a link between the touristic coast and the built-up areas of the Heights.

    Comments

     

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 350 million

    Total cost (Approximate amount)

    EUR 730m

    Environmental aspects

    The project is located close to the coast and therefore in environmentally sensitive areas. As a new expressway, the project falls within Directive 97/11/EC and, in accordance with national legislation, has been subjected to an environmental impact assessment as part of the Public Interest Declaration process.

    Procurement

    The promoter is subject to Community directives on the procurement of works, services and supplies. Accordingly, all contracts above the stipulated applicability level have been, or will be, the subject of international invitations to tender, published in the OJEC.

    Status

    Signed - 16/09/2004

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    France Transport