    Reference: 20030088
    Release date: 26 June 2003

    Promoter – Financial Intermediary

    Electrostopanstvo na Makedonija (ESM)

    Location

    Description

    The project concerns the construction/replacement of 400 and 110 kV power substations in the country (Skopje 5, Skopje 4, Petrovec, and Dracevo), the construction of ancillary transmission lines and related infrastructure all to be confirmed during appraisal.

    Objectives

    The project is integral to a larger restructuring of the power sector in FYR of Macedonia, outlined by the Government, as well as to agreements made to establish a regional electricity market and interconnections in South-eastern Europe by 2005. The objective of the project is to contribute to the reduction in power system losses and bottlenecks, and to allow better use of existing generating capacity by improving operational efficiency.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 15 million

    Total cost (Approximate amount)

    About EUR 30 million

    Environmental aspects

    Following EU standards, the project would not fall under the environmental impact assessment directive. The project is unlikely to impact any nature conservation site. These issues will be reviewed to ensure that each project component has been or will be adequately assessed for compliance with environmental regulations in FYROM and in line with EU standards.

    Procurement

    EIB procedures for international procurement would be applied, where applicable. It is intended that the components to be financed by the Bank will be published in the OJEC; some have already been published internationally.

    Status

    Signed - 2/12/2003

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).