Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20020567
    Release date: 30 March 2004

    Promoter – Financial Intermediary

    Enagás, S.A.

    Location

    Description

    The project consists of the reinforcement and extension of the Spanish gas transmission network and gas reserve facilities.

    Objectives

    The investments would cover practically all Spanish regions, mostly assisted areas Objective 1 and 2. The investments are included in the 2002-2011 Spanish National Energy Plan.

    Comments

    Electricity and gas.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 450 m representing 48% of project cost.

    Total cost (Approximate amount)

    EUR 930 m.

    Environmental aspects

    The various project schemes fall under Annex I or Annex II categories of the EU directive 85/337 as amended by directive 97/11. Given that requirements for environmental assessment vary from one autonomous province to another, the Promoter has adopted a standard procedure for all pipeline projects that include a full EIA in accordance with the requirements of the directives.

    Procurement

    The promoter, like most of the Spanish and Portuguese utilities, is a subscriber to Repro, an open classification system recognised to be in line with the requirement of EC directive 93/38. The system establishes common vendor lists after regular publication of pre-qualification notices in the OJ of the EU. Contracts are then awarded after restricted tendering of suppliers from the vendor list. These procedures are acceptable to the Bank.

    Status

    Signed - 21/06/2004

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Energy