Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20020138
    Release date: 17 July 2002

    Promoter – Financial Intermediary

    Ministry of Education

    Location

    Description

    Construction and equipment of 337 new schools and refurbishment / extension of 1877 existing schools covering the entire public compulsory (primary and secondary) education estate in Jordan.

    Objectives

    Increase the availability of adequate classrooms and enable a normal accommodation for an increased number of new students to improve the enrolment rates in the basic and secondary cycles. Enlarge the local qualified manpower and increase earnings expectations and living standards of the local population.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 100 million

    Total cost (Approximate amount)

    About EUR 525 million

    Environmental aspects

    The environmental impact of the project is expected to be minor and linked to construction and changes in traffic movements.

    Procurement

    The Ministry of Education will follow usual open public tender procedures in line with the Bank's procurement guidelines.

    Status

    Signed - 17/07/2003

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Jordan Education