    Reference: 20010345
    Release date: 11 December 2001

    Promoter – Financial Intermediary

    Autocesta Rijeka-Zagreb d.d.

    Location

    Description

    The project will include the design and the construction of two sections of the Rijeka-Zagreb Motorway (Vrbovsko-Bosiljevo and Bosiljevo-Vukova Gorica) for a total length of approximately 24 km. Another section is currently under construction and has received the financial support of KfW. All the other sections are open to traffic (of which about one third as semi-motorway) and have been financed by the State budget, commercial banks, the EBRD and the World bank.The Rijeka-Zagreb Motorway has a total length of 147 km and is divided into 10 Sections. 

    Objectives

    The project is of high priority for the Croatian Government. It concerns Pan-European Corridor Vb and as such is of wider interest on a European scale.

    Comments

    Roads

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Approximately EUR 90 million

    Environmental aspects

    The project will have considerable impact on the environment, and the implications of this both on a formal and a substantive level will have to be carefully verified.In accordance with its normal procedures, the Bank will ensure that appropriate measures (including EIAs similar in practice to those required by EU law) will be taken with respect to environmental protection and that any possible negative impact will be studied and appropriate mitigating measures taken in good time.

    Procurement

    EIB procedures for international procurement would be applied, where applicable.

    Status

    Signed - 24/06/2002

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Croatia Transport