Release date: 16 August 2001
Promoter – Financial Intermediary
Slovak Road AdministrationLocation
Description
Construction of 3.9 km of 2x2 lane motorway in the district of Petrzalka in Bratislava, between, the Vienna Road and the Pristavný bridge, on the alignment of an existing highway.
Objectives
The project will complete a motorway bypass of Bratislava.
Comments
Roads.
Sector(s)
Proposed EIB finance (Approximate amount)
Estimated at EUR 40 million.
Total cost (Approximate amount)
About EUR 80 million
Environmental aspects
The project was the subject of preliminary and in-depth impact studies as well as public enquiry, and has been approved by the Slovak Ministry of Environment. The main negative impacts concern noise and the barrier effect to the local population, and will be adequately mitigated. Positive effects will arise from the reduction of traffic in nearby residential areas. Emissions and noise levels will be monitored after construction to ensure compliance with the legal limits.
Procurement
The works contracts will be procured based on open international tendering.
Status
Signed - 13/03/2003
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).